Chongqing Rail Transit Line 6

Chongqing Rail Transit Line 6

Intro

Chongqing Rail Transit Line 6 starts from the Chayuan Station in Nan'an District in the east to Beibei Station in Beibei District in the north, and it has a branch line - Guobo Line. It also plans to build Yinglong Branch Line in the long term. The total length of the line is 72.26 km, of which the main line is about 60.26 km, and the Guobo Branch Line is 12 km. Both the main line and the branch line use the subway system.






Using Models:Water-cooled screw unit (SL)